How To Install a Hanging Light Pendant

In 5 easy to follow steps learn how to install a hanging light pendant.

Time needed: 15 minutes.

Steps to install hanging light pendant.

  • Step 1

    Turn the main power off.

  • Step 2

    Connect electrical wires as shown in diagram.

  • Step 3

    Strip electrical wires a max of 7mm (if using quick connects).

  • Step 4

    Install ceiling rose with supplied screws.

  • Step 5

    Turn main power on. turn on

Free Shipping On All Orders Nov. 5th - Nov. 26th
Free Shipping On All Orders.